Task 2.4 Industry Requirements (Active)

Due Date: 1/31/2020
Start Date: 9/12/2019
End Date: 10/17/2019

Schedule and facilitate meetings with representatives from various renewable energy industries to summarize development plans, requirements and challenges associated with renewable energy development in the study area. Information and data to be collected will include the following: • Wind resource maps (NOAA and NREL). • High Power Transmission Lines (existing and proposed). • Existing and proposed renewable energy development areas. • Conduct a review of current and planned renewable energy projects, transmission lines.